We test before we treat
Reading the water first isn't optional to us.

Al Zuhour is a new subdivision of Obhur Al Shamaliyah in north Jeddah: new villas and apartments sitting beside rest houses and subdivisions still under active construction. Building continues around the area, and fine sand and construction dust release continuously. The new pools here carry a specific load: construction dust is relentless, and the new system has not yet adapted to this pressure.
New pools in Al Zuhour face sustained construction dust more than any other district: active building around the area means dust is released constantly and unavoidably. For the method itself, see the full swimming pool cleaning page.
Neighbouring subdivisions are still under construction, and excavation, concrete work and new pipework release construction dust that drifts into nearby pools. This dust contains cement, lime and mineral particles that all clog filters rapidly.
Pools, pumps and filters are brand new. No usage patterns are yet established, and the system has not adapted to sustained pressure from construction dust. Special protective treatment may be needed from day one.
Proximity to the coast and coastal humidity mixed with construction dust create complex layered deposits on the water. These layers block light and accelerate bacterial growth, not just algae.
The district is part of the new urban tract north of Jeddah on the Jeddah Madinah Road, where land and housing are still being released and built, and neighbouring subdivisions under construction continuously raise dust.
Water chemistry testing from day one is essential: construction dust shifts properties fast, and new systems do not stabilise easily.
Wall scraping may be less urgent at first in Al Zuhour, but filter protection from dust is critical from the start.
Floor vacuuming reveals fine cement silt: this is normal in an area under active construction.
Skimmer and baskets clog very fast: cleaning every two or three days is necessary.
Filter backwash must be forceful and sometimes chemical: construction dust clogs media at an unusual rate.
Chemical balance needs almost daily monitoring in the start-up phase: stability comes only with time.
pH, sanitiser and hardness are read at the start.
Floating leaves and debris come off before we brush.
Algae and the oily waterline film cling to the surfaces.
Silt settles in the deep end and the corners the return jets never reach.
The skimmer and pump baskets are cleared and the filter checked or backwashed.
With the water clean, we balance and dose, then walk the pool with you before leaving.
New development: ongoing construction and vacant plots between the homes
New development means construction dust releases continuously from neighbouring building works, and the new system has not yet adapted to it. Treatment here focuses on protecting equipment and water from dust first, before anything else matters.
Reading the water first isn't optional to us.
The company runs a large crew, and we send a team rather than one person.
Pumps, vacuum heads and the test kit come with the team.
If the pump or the plumbing is the real problem, we tell you.
Photographs from real jobs carried out by the crew.












The commitment is simple enough to actually keep: we don't leave until you've seen the result and had your say on it.
North Jeddah is largely newer villa districts and compounds around Obhur and inland from it. Homes here tend to have marble or porcelain floors, large windows and a garden or courtyard, so the routine is set by what comes in from outside: fine sand carried on sandals, and sprinkler spray that dries to a chalky ring on tiles. Near the creek and the coast, sea air leaves a faint salt film on glass and on outdoor cushions, which stiffens fabric. Curtains and upholstery in these open plan rooms catch the dust that settles overnight.
We provide these in Al Zuhour too, and more than one can share a single visit.