We test before we treat
Reading the water first isn't optional to us.

Al Muruj is a new-build district within Obhur Al Shamaliyah in north Jeddah, with vacant plots and construction work underway between newly built homes. New pools need different testing and construction dust clogs the filter rapidly, and the district grows so fast that surrounding conditions change month to month.
The district grows rapidly and construction is underway in multiple zones, so dust and earth from excavation and building enter pools constantly throughout the year. For the method itself, see what swimming pool cleaning involves.
Ongoing construction means building dust, earth and sand enter neighbouring pools constantly. The filter fills very quickly and water loses clarity within days of the last cleaning.
Newly refilled pools may contain sand and building debris, and new water tanks may hold mineral sediment. The first test needs depth because water may be contaminated from the source.
New building blocks wind patterns in some areas and opens them in others, shifting heat, shade and air movement. The balance that works today may need adjusting next month.
A subdivision within Obhur Al Shamaliyah in north Jeddah, mostly newly released land and housing within the city's new northward urban extension, served by Jeddah Madinah Road and King Abdulaziz Road.
Water contaminated by construction dust needs intensive cloudiness testing before chlorine because earth particles clog the filter quickly.
Pool walls and waterline collect construction dust very rapidly so they need frequent brushing and vigorous scrubbing to remove settled particles.
The pool floor collects building sand and earth very quickly so frequent vacuuming is essential to keep the bottom clear.
Skimmer and basket fill with construction dust very rapidly so we empty and clean them at every visit without exception.
The filter handles very heavy dust load from building work so we backwash hard and frequently to keep media clear and flow steady.
Chemical balance may be affected by minerals in new water so we test and adjust conservatively because new tanks may hold sediment.
pH, sanitiser and hardness are read at the start.
Floating leaves and debris come off before we brush.
Algae and the oily waterline film cling to the surfaces.
Silt settles in the deep end and the corners the return jets never reach.
The skimmer and pump baskets are cleared and the filter checked or backwashed.
With the water clean, we balance and dose, then walk the pool with you before leaving.
Reading the water first isn't optional to us.
The company runs a large crew, and we send a team rather than one person.
Pumps, vacuum heads and the test kit come with the team.
If the pump or the plumbing is the real problem, we tell you.
Photographs from real jobs carried out by the crew.












The commitment is simple enough to actually keep: we don't leave until you've seen the result and had your say on it.
New development: ongoing construction and vacant plots between the homes
Ongoing construction around pools means constant dust and rapid changes in surrounding conditions. New pools and building land require strict monitoring because contaminants enter from multiple sources continuously.
We provide these in Al Muruj too, and more than one can share a single visit.