We test before we treat
Reading the water first isn't optional to us.

Al Buhairat is a new development in north Jeddah within the Obhur subdivisions, with vacant land and ongoing construction between newly built homes. Pools here face constant dust from open ground and streets still settling after paving, and new filtration systems that may not be properly calibrated yet. Early testing is essential before any cleaning starts, because the district is new and systems are still stabilising.
The new district generates fine dust from open land and active building work that enters pools quickly, and modern filtration systems need correct calibration from the outset. For the method itself, see our swimming pool cleaning service in detail.
Streets in Al Buhairat are newly laid, and wind carries fine asphalt dust from fresh roads toward the pools. This fine dust enters water easily and doesn't settle quickly, putting extra pressure on the filter in the first year of operation. By year two, this stress reduces significantly.
Open land and ongoing construction around the pools release dust and building grit daily. This is completely different from completed districts where dust is limited. Here, the filter clogs faster and precise testing becomes almost a daily necessity in peak seasons.
New pools in Al Buhairat come with modern filters that may not be calibrated correctly by the contractor. Filter pressure and flow rate may be wrong, and early testing reveals this before it becomes a lasting problem that compounds over months.
Al Buhairat lies within the Obhur Al Shamaliyah subdivisions of north Jeddah where Jeddah Municipality has asphalted, paved and lit dozens of internal streets, mostly newly built plots with ongoing construction.
Testing Al Buhairat water must reveal dust loads from new streets and active building quickly before filter clogging becomes critical.
Brushing new pool walls may reveal layers of asphalt dust and construction grit, not just ordinary mineral scale.
Vacuuming the floor must be thorough because fine dust from streets and building settles in low areas rapidly.
Skimmer and basket cleaning must be very frequent in the first year because dust fills them fast.
Backwashing may be weekly or more in Al Buhairat because dust loads are very high during active building and paving.
Chemical balance must account for fine dust affecting chlorine and pH rapidly during construction phases.
pH, sanitiser and hardness are read at the start.
Floating leaves and debris come off before we brush.
Algae and the oily waterline film cling to the surfaces.
Silt settles in the deep end and the corners the return jets never reach.
The skimmer and pump baskets are cleared and the filter checked or backwashed.
With the water clean, we balance and dose, then walk the pool with you before leaving.
New development: ongoing construction and vacant plots between the homes
Al Buhairat is a new development where building and paving are still ongoing around the pools. Dust and grit from new streets and vacant land enter the water constantly, and modern filtration systems may need repeated adjustment and calibration until surrounding land stabilises and building activity slows.
Reading the water first isn't optional to us.
The company runs a large crew, and we send a team rather than one person.
Pumps, vacuum heads and the test kit come with the team.
If the pump or the plumbing is the real problem, we tell you.
Photographs from real jobs carried out by the crew.












The commitment is simple enough to actually keep: we don't leave until you've seen the result and had your say on it.
Al Buhairat is easily reached via the Jeddah Madinah Road, which serves as the main route to the district, and Abhor Park provides a clear reference point for locating homes and residential clusters accurately in this newly emerging area.
We provide these in Al Buhairat too, and more than one can share a single visit.