We test before we treat
Reading the water first isn't optional to us.

Al Mawj is the southernmost subdivision in Jeddah, an area still under construction with many vacant plots. Pools here are new and construction continues around the district. Water needs frequent testing because construction dust and unpaved roads send dirt into the water every day. The filter clogs extremely rapidly.
Dust and mud from unpaved roads and ongoing construction enter the pools very heavily. The filter may need backwashing every two days. Pools here present the most challenging water conditions. For the method itself, see how we approach swimming pool cleaning.
Al Mawj has many unpaved roads and ongoing construction. Heavy dust and mud enter the water continuously. The filter may clog completely within two days. We monitor filter pressure carefully and backwash more often than any other district.
New pools combined with heavy dust and mud accelerate algae growth. Water may look green within the first week. Treatment may require very strong concentration and daily testing.
New pipework leaves mineral and scale deposits. Walls may appear white with buildup. Specialised treatment may be needed to remove this.
The furthest southern subdivision in Jeddah next to the regional Al Lith highway. An area under development with many vacant plots, unpaved roads and scattered new buildings.
Heavy dust and mud from unpaved roads mean testing must be nearly daily in peak construction.
Walls and steps collect heavy mud, so brushing may be needed daily or every two days.
The filter clogs extremely fast, so backwash cycles may need to run daily.
Skimmer, baskets and strainers fill with mud and gravel, so cleaning may need to happen daily.
Backwash cycles for the filter in Al Mawj may need very close monitoring and daily repetition.
Chemical balance shifts very rapidly here so testing may be needed daily.
pH, sanitiser and hardness are read at the start.
Floating leaves and debris come off before we brush.
Algae and the oily waterline film cling to the surfaces.
Silt settles in the deep end and the corners the return jets never reach.
The skimmer and pump baskets are cleared and the filter checked or backwashed.
With the water clean, we balance and dose, then walk the pool with you before leaving.
Reading the water first isn't optional to us.
The company runs a large crew, and we send a team rather than one person.
Pumps, vacuum heads and the test kit come with the team.
If the pump or the plumbing is the real problem, we tell you.
Photographs from real jobs carried out by the crew.












The commitment is simple enough to actually keep: we don't leave until you've seen the result and had your say on it.
New development: ongoing construction and vacant plots between the homes
A new development in far southern Jeddah means unpaved roads, heavy dust and ongoing construction. Water here needs the strongest treatment and most frequent testing of any district. The filter clogs extremely fast and chemistry shifts daily, so we monitor this with exceptional care.
We provide these in Al Mawj too, and more than one can share a single visit.