The right gear for drinking water
Pumps to clear sludge, scrubbing to remove biofilm, and disinfectant meant for potable storage.

Al Khaleej is a newly developing district in north Jeddah, named after the Khaleej Obhur creek that sits beside it. Homes are new, construction continues all around, and vacant plots dot the neighbourhood. The tanks are new but the building work raises metal dust daily and coastal moisture seeps in constantly. Water needs regular cleaning because active construction pollutes faster than settled residential areas ever do.
Tanks are new but active construction nearby raises metallic dust daily, and coastal humidity causes faster algae and bacterial growth than in districts far from the shore. For the method itself, see how we approach water tank cleaning.
Empty plots, foundations and construction cranes around the district throw metal dust into the air throughout daylight hours. Dust travels on air and enters the tank via ventilation openings and small gaps. The tank is new but the construction chaos around it makes it foul unusually fast.
The district sits next to the sea and air is salt-heavy and damp year round. A new tank may look spotless, but moisture penetrates seals and algae thrives faster than in inland areas. Disinfection must be frequent because coastal moisture continuously reintroduces contaminants.
Empty plots between new villas trap dust and moisture in pockets. Still air between houses carries pollutants toward the tanks. Cleaning here must account for the fact that the environment itself continuously fouls the tank, not just user neglect.
A newly built district north of Jeddah named after Khaleej Obhur, a sea creek running alongside, with mostly new residential buildings spreading between King Abdulaziz Road, Jeddah Madinah Road and the North Corniche.
Tank inspection in Al Khaleej must focus on detecting metal dust from construction and salt deposits from coastal humidity.
Full drainage is essential because even a new tank will contain sediment from active construction sites nearby.
Sediment here is metal oxides from building work and algal growth accelerated by coastal salt and moisture.
Scrubbing must target algae removal and metal sediment with equal vigour because both types resist normal settling.
Disinfection must be strong to kill algae and bacteria that thrive in coastal moisture and salt air.
Lid and vent inspection must be careful because small openings allow construction metal dust to enter continuously.
The supply into the tank is shut and the tank is drained completely.
The sludge on the floor is scooped and pumped out first.
The biofilm on the walls is physically scrubbed off.
With the walls and floor clean, a disinfectant made for drinking-water storage is applied and given time to act on every surface.
The disinfectant and any loosened residue are rinsed down and pumped out, so the first tank of water after us is not carrying it.
We check the cover seal and inlet before refilling, so dust and insects stay out, then start the refill while you watch it run clear.
New development: ongoing construction and vacant plots between the homes
New development means the homes and tank are both new, but the environment is actively polluted. Construction raises metal dust daily, coastal air brings constant salt and moisture, and algae grows faster than in inland new areas.
Pumps to clear sludge, scrubbing to remove biofilm, and disinfectant meant for potable storage.
We send a team, not one person, so a tank is drained, cleaned, disinfected and refilled in a single visit rather than left open for days.
We look at the lid seal and inlet, because a tank that got dirty fast usually has a way in.
Nothing is closed until the tank is refilling and you have seen the water run clean.
Photographs from real jobs carried out by the crew.












The commitment is simple enough to actually keep: we do not leave until the tank is disinfected, refilling, and you have seen it for yourself.
Al Khaleej sits directly beside Khaleej Obhur creek and lies along King Abdulaziz Road and Jeddah Madinah Road. The tank usually sits on the roof of the new residential building, reached via the main road or from the side streets running toward the waterfront landmark.
We provide these in Al Khaleej too, and more than one can share a single visit.